Cloud Infrastructure + Operations | E-commerce

How a Global E-Commerce Platform Scaled Into New Regions Without Scaling Its Manual Workload

A leading global e-commerce platform needed to scale into new regions and support high-traffic events like Diwali and Black Friday, while manual processes limited responsiveness.

Working with an Aditi DevOps team, the client automated regional scaling, migrated more than 8,000 hosts across cloud environments, and streamlined instance lifecycle management — eliminating more than 100 engineer-years of manual effort and reducing infrastructure costs.

At a glance

Migration

8,000+ hosts across cloud environments

Automation

Regional scaling and instance lifecycle management

Effort eliminated

100+ engineer-years of manual work

Peak readiness

Custom High-Volume Event (HVE) scaling tools

The Challenge

Manual Processes Were Limiting Regional Expansion and Peak-Period Readiness

The Challenge

As the client expanded into new regions and prepared for high-traffic events such as Diwali and Black Friday, manual processes limited responsiveness and made regional launches and peak-period operations harder to support — leaving a clear need for scalable tooling, infrastructure automation, and migration support to meet growth goals efficiently.

The Solution

Automating Regional Scaling and Peak-Event Infrastructure

The Solution

With Aditi’s DevOps team working alongside the client, the e-commerce platform automated regional scaling (an estimated 81 engineer-years saved) and host migration (an estimated 30 engineer-years saved), and built custom fleet-scaling and High-Volume Event tools to keep infrastructure stable during peak periods. Instance migration automation was projected to save costs further.

Business Outcomes

  • More than 100 engineer-years of manual work eliminated through regional setup and host-migration automation
  • Infrastructure cost savings reported in the source, with a headline reference to $20M
  • Infrastructure prepared for high-traffic events with minimal disruption
  • Regional rollout and large-scale host migration supported by custom tooling

What Changed

The client’s infrastructure team now relies on automated tooling for regional scaling, host migration, and peak-event preparation, reducing manual operational effort and running with minimal oversight — helping the team support global expansion and high-traffic periods.

Technology Environment

Technology Environment

Region Flex Infrastructure, Legacy-to-Cloud Migration Framework, Instance Lifecycle Automation, High-Volume Event (HVE) Scaling Tools

Technology Environment

  • Region Flex Infrastructure: Automated rollout and scaling support for new regions.
  • Legacy-to-Cloud Migration Framework: Tools for seamless large-scale host transitions across environments.
  • Instance Lifecycle Automation: Systems to streamline instance migration and optimize resource use.
  • High-Volume Event (HVE) Scaling Tools: Custom utilities to prepare and stabilize infrastructure during retail peak events.

Ready to scale infrastructure without scaling manual effort?

Engineer automation for regional growth, migrations, and the operational peaks that matter.